DBCT outloading berth
Expansion Plan

Modifications and enhancements are proposed to all major terminal elements of inloading, stockyard and outloading.

The additional infrastructure to be installed comprises the following:

  • a complete new third inloading system including rail loop, and dump station
  • expansion of the Stockyard with 3 additional machinery bunds, 2 new stockpile rows and 4 additional stacking/reclaiming machines
  • a complete third outloading string feeding the 3 existing berths
  • an optional fourth berth; and
  • additional controls to reduce the impact of noise and dust emissions

The current terminal configuration, with the above expansion scope components shown, can be seen in an animated presentation